loading

T-works, professional manufacturer for piling machinery with more than 20 years expecience.

Efficient Dismantling ! Witness the Full Process of Dismantling and Shipping T-works 180T Pile Driver Machine 1
Efficient Dismantling ! Witness the Full Process of Dismantling and Shipping T-works 180T Pile Driver Machine 1

Efficient Dismantling ! Witness the Full Process of Dismantling and Shipping T-works 180T Pile Driver Machine

Our pile drivers are being shipped continuously. Taking the small-tonnage ZYC120BS-GB1 as an example, this article details the full process of its dismantling and shipping. Benefiting from the structural characteristics of small-tonnage models, the entire dismantling process was efficient and orderly, taking only a few hours from dismantling to loading. Finally, the equipment was dispatched in optimal condition to the customer's project site.



5.0
design customization

    oops...!

    no product data.

    Go to homepage


    Our pile drivers are being shipped continuously. Taking the small-tonnage ZYC120BS-GB1 as an example, this article details the full process of its dismantling and shipping. Benefiting from the structural characteristics of small-tonnage models, the entire dismantling process was efficient and orderly, taking only a few hours from dismantling to loading. Finally, the equipment was dispatched in optimal condition to the customer's project site.


    Remove the four legs
    This dismantling strictly followed the dedicated procedure for small-tonnage machines, with the first step focusing on removing the four outriggers. The outriggers of this pile driver are connected by thickened and heavy-duty steel screws—this connection method not only ensures structural stability but also greatly enhances dismantling convenience. In accordance with standard procedures, workers first removed the connecting bolts in an orderly manner, then took off the steel screws. During this process, mechanical dismantling torque control standards were strictly observed to avoid any damage to the outriggers and connecting parts. After completing the above steps, professional lifting equipment was used to slowly move out the outriggers at a precisely calculated lifting angle and speed. Each of the four outriggers is marked with a clear position identifier, which eliminates the trouble of positioning during subsequent on-site installation by the customer and effectively reduces positioning time and the risk of human error in the installation process.
    Efficient Dismantling ! Witness the Full Process of Dismantling and Shipping T-works 180T Pile Driver Machine 2



    Efficient Dismantling ! Witness the Full Process of Dismantling and Shipping T-works 180T Pile Driver Machine 3
    Process the fuselage main body
    After the outriggers were dismantled, the work entered the stage of handling the main body of the machine. Using professional lifting equipment that meets the required lifting capacity, workers smoothly lifted the main body away from its original position. For the bottom of the main body—an area prone to dust accumulation and corrosion—focused cleaning was carried out. Meanwhile, paint touch-up and anti-rust treatment were conducted: professional coatings were used to repair local paint abrasions, further enhancing the machine's corrosion resistance and ensuring it maintains good condition during transportation and subsequent use.



    Handle the traveling mechanism
    With the smooth completion of the first two steps, all core components of the pile driver were effectively separated. For the two long boats and two short boats of the traveling mechanism, workers classified and protected them separately according to component size, weight and transportation requirements. Before loading, technicians conducted a comprehensive and detailed inspection of all disassembled components in accordance with equipment factory inspection specifications and project acceptance standards. Professional testing tools, such as non-destructive testing equipment and hardness testers, were used to perform flaw detection and hardness tests on key parts of the components—ensuring no internal defects and surface hardness meeting design requirements. At the same time, the integrity and flatness of the threads at each connection point were checked one by one to eliminate potential risks before transportation that could affect the subsequent performance of the equipment. Through strict quality control, we strived to deliver every component to the customer in optimal condition.

    Efficient Dismantling ! Witness the Full Process of Dismantling and Shipping T-works 180T Pile Driver Machine 4



    Efficient Dismantling ! Witness the Full Process of Dismantling and Shipping T-works 180T Pile Driver Machine 5
    Load onto the vehicle and ship
    Considering that 180 tons falls into the small-tonnage category, the transportation link also demonstrated advantages of high efficiency and convenience. Only 2-3 17-meter transport vehicles were deployed for this shipment to load all components. Compared with the complex transportation plans for large-tonnage machines, this significantly reduced transportation costs and scheduling difficulties, while shortening the transportation preparation cycle—providing strong support for the rapid launch of the customer's project. The selection of transport vehicles was scientifically planned based on component size and weight distribution to ensure balanced load-bearing, preventing safety risks caused by unstable center of gravity or overloading during transportation. Additionally, a comprehensive emergency plan was formulated for road conditions and weather factors during transportation to ensure the equipment is safely and punctually delivered to the customer's project site.



    As of press time, the transport fleet carrying this 180-ton machine has set off smoothly. In the future, our company will continue to uphold a professional and rigorous work attitude, continuously optimize the equipment dismantling, transportation and delivery processes, and ensure every piece of equipment is safely and efficiently delivered to customers, supporting the smooth progress of their projects.


    Basic Information
    • Year Established
      2005
    • Business Type
      --
    • Country / Region
      Changsha
    • Main Industry
      Engineering & Construction Machinery
    • Main Products
      Hydraulic Static Pile Driver, Drilling rigs, Crawler dumper truck
    • Enterprise Legal Person
      Fengyong
    • Total Employees
      --
    • Annual Output Value
      --
    • Export Market
      Southeast Asia,Others
    • Cooperated Customers
      --
    Company Profile
    Found in 2005, Changsha Tianwei Engineering Machinery Manfuacturing Co.,Ltd is a modern joint-stock private enterprise . It is specialized in R & D and manufacturing series of Hydraulic static pile driver ans other piling machinery such as bored pile drilling rig, hydraulic piling hammer, & piling frame and so on.
    As on of the largest exporter for hydraulic static pile driver in China, T-works is well-known in domestic and abroad, and also holds the most market share in Singapore, Malaysia, Indoensia, Myanmar, Ukraine, Brunei, Thailand, Cambodia etc.
    Bigger than 22000 m2 of workship as put into operation, T-works also has a group that are advanced engineers and CNC machines, lean production, 6S management as weel as the Global marketing & after -sale service team.Nowwadays we can meet different requirements of construction sites from design, manfacture ,sale and service.
    We follow the motto”Modesty , Sincerity & To be Excellent ” and will provide not only reliable products butalso excellent and efficient service.
    Welcome to visit us!
    Company Video
    Certifications
    Efficient Dismantling ! Witness the Full Process of Dismantling and Shipping T-works 180T Pile Driver Machine 6
    ISO 9001:2015
    Issue by:YIHUAN CERTIFICATION CENTER CO.,LTD
    Efficient Dismantling ! Witness the Full Process of Dismantling and Shipping T-works 180T Pile Driver Machine 7
    ISO 14001:2015
    Issue by:YIHUAN CERTIFICATION CENTER CO.,LTD
    Efficient Dismantling ! Witness the Full Process of Dismantling and Shipping T-works 180T Pile Driver Machine 8
    CE
    Issue by:UDEM
    Get in touch with us
    just leave your email or phone number in the contact form so we can send you a free quote for our wide range of designs
    Related Products
    no data
    CONTACT US
    Contacts: Ivy
    Tel: +86-150 84873766
    WhatsApp: +86 15084873766
    Address: No.21, Yongyang Road, Liuyang Hi-tech Industrial Development Zone, Changsha, Hunan, China 410323

    T-works will provide not only reliable piling machinery products butalso excellent and efficient service.

    Copyright © 2026 Changsha Tianwei Engineering Machinery Manufacturing Co.,Ltd - www.t-works.cc All Rights Reserved.  | Sitemap  |  Privacy Policy
    Customer service
    detect